Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | N/M |
Model Number : | SS123 |
Certification : | ISO 9001 |
Price : | 0.1-100USD |
Payment Terms : | T/T |
Supply Ability : | 500000pcs per month |
Delivery Time : | 3-10DAYS |
Aluminum ACR welding studs /welded studs
size from M3-M12
Mild steel, stainless steel and aluminum are applicable materials
for Arc Welding.
1: A fastener and ceramic ferrule are firmly placed against the
work surface under spring tension.
2: Upon triggering, the weld gun automatically lifts the fastener
from the base metal and initiates a controlled electric arc - which
melts the end of the fastener and a portion of the base metal.
3: A ceramic arc shield concentrates the heat and retains the
molten material in the weld area for maximum weld strength and
reliability.
4: At the precise moment the fastener and the parent metal become
molten, the fastener is automatically plunged into the work
surface. The metal solidifies and a high quality fusion weld is
completed.
Inserts
Can eventually work loose. They can also crack paint and leave
unsightly stains. Holes need to be punched and deburred in parent
material. The reverse side is not always clean and flat. The parent
material is weakened by the holes.
Back Welding
The process is slow. Holes need to be punched and deburred in
parent material. The excess weld needs grinding off, for a clean,
flat finish. The parent material is weakened by the holes.
Through Bolting
Requires two handed assembly and access from both sides. Holes need
to be punched and deburred in parent material. Bolt heads are
unsightly and stains can come from the bolt holes. The assembly is
not leak-proof and the parent material is weakened by the presence
of the holes.
FAQ
1.What's your experience like?
Our general manager has been engaged in the export of fasteners
since 2005.
Our team can provide you with professional fasteners selling and
smooth export services.
2.How about your price?
High quality products with reasonable price. Please give me a
inquire, We will quoted you a price for you
refer at once.
3. How do you control your quality?
We require the quality control department to inspect every
production link of each shipment. And we can provide you MTC and
mill certificate when the goods is finished.
![]() |